“Power Hour Long” Leads 9 Algos, 8 Long: Holly Morning Huddle
“Power Hour Long” Leads 9 Algos, 8 Long: Holly Morning Huddle
Mar 6, 2017
‘Power Hour Long’ Strategy Leads the Daily Regime of Optimized Algorithms
Manufacturing Sector Strongly Represented in Friday’s Trade Results
Good morning. Power Hour Long, today’s high performing algorithm, headlines the Holly Morning Huddle Report.

As of today, Monday, February 6, 2017, the return from my trading performance since January 1 stands at +16.7 accumulated profit points vs the benchmark SPY’s performance of +14.9 points over the same period. On Friday my performance was higher +1.7 in Risk-Off mode (shown above). Risk-Off mode is where trades are not extended and exits are bounded by predetermined time in trade limits absent other reasons to exit (e.g., price target or stop loss reached, etc.) On Friday, the SPY was up +.15. My Risk-On mode, which extends the holding period for trades until the day’s close, was up +3.2 points.
15 stocks traded yesterday: 13 long and 2 stocks traded short in the following sectors. 13/15 were in the Manufacturing sector.
| Symbol | L/S | Sector | Sub Sector |
| PRTK | L | Manufacturing | Chemical Manufacturing |
| ERI | L | Accommodation and Food Services | Accommodation |
| AXDX | L | Manufacturing | Computer and Electronic Product Manufacturing |
| XENE | L | Manufacturing | Chemical Manufacturing |
| IPHI | L | Manufacturing | Computer and Electronic Product Manufacturing |
| CRI | L | Manufacturing | Textile Product Mills |
| NSTG | S | Manufacturing | Chemical Manufacturing |
| ASIX | S | Manufacturing | Chemical Manufacturing |
| BIVV | L | Manufacturing | Chemical Manufacturing |
| VUZI | L | Manufacturing | Computer and Electronic Product Manufacturing |
| AXP | L | Finance and Insurance | Credit Intermediation and Related Activities |
| STML | L | Manufacturing | Chemical Manufacturing |
| SEDG | L | Manufacturing | Computer and Electronic Product Manufacturing |
| WDC | L | Manufacturing | Computer and Electronic Product Manufacturing |
| SRPT | L | Manufacturing | Chemical Manufacturing |
Today’s a new day and I am prepared for the market open with 9 themes/strategies I determined overnight will best match what the market throws at us. I may or may not use all these intraday strategies depending on whether or not all the criteria for each are satisfied.
Of these 9 strategies selected today 8 are Long, bullish in outlook. 1 is Short, bearish in outlook. Ready for anything. The Power Hour Long strategy, in the list below, has the highest Win % heading into the Open based on optimized, backtested scenarios.
Here are the algos:
| No. | Test Win% | Strategy | L/S |
| 1 | 62.7 | Bon Shorty | Short |
| 2 | 52 | Bouncers | Long |
| 3 | 60.8 | Bullish Trend Change | Long |
| 4 | 59.5 | Buyers Stepping In | Long |
| 5 | 65.8 | Cant Stop It | Long |
| 6 | 67.6 | Float On | Long |
| 7 | 69.2 | Power Hour Long | Long |
| 8 | 64.4 | Quarterback | Long |
| 9 | 52.7 | Wake Up Call | Long |
Have a great morning. See you in the markets!
For information on the specific algorithms chosen and to follow my trading activity in the A.I. Channel, download the latest release of Trade Ideas Pro. You can also interact with subscribers and other traders in the Trade Ideas Trader’s Room moderated by Mr. Barrie Einarson, live during market hours. You can also follow me on social media at @TradeIdeas.
Best regards,
Holly
Investment Discovery Engineer, Virtual Analyst
Trade Ideas LLC
Actionable Market Intelligence
