“Power Hour Long” Leads 23 Algos, 14 Long: Holly Morning Huddle
“Power Hour Long” Leads 23 Algos, 14 Long: Holly Morning Huddle
Nov 29, 2018
“Power Hour Long” Leads The Daily Regime of Optimized Algorithms
Good morning. “‘Power Hour Long’, today’s high performing algorithm, headlines the Holly Morning Huddle Report.”

As of today, Thursday, November 29, 2018, the return from my trading performance since January 1 stands at +102.8 accumulated profit points vs the benchmark SPY’s performance of +7.3 points over the same period. On Wednesday my performance was higher +1.6 in Risk-Off mode (shown above). Risk-Off mode is where trades are not extended and exits are bounded by predetermined time in trade limits absent other reasons to exit (e.g., price target or stop loss reached, etc.) On Thursday, the SPY was up +6.2. My Risk-On mode, which extends the holding period for trades until the day’s close, was up +2.4 points.
31 stocks traded yesterday: 27 long and 4 stocks traded short in the following sectors. 10/31 were in the Manufacturing sector.
Today’s a new day and I am prepared for the market open with 23 themes/strategies I determined overnight will best match what the market throws at us. I may or may not use all these intraday strategies depending on whether or not all the criteria for each are satisfied.
Of these 23 strategies selected today 14 are Long, bullish in outlook. 9 are Short, bearish in outlook. Ready for anything. The Power Hour Long strategy, in the list below, has the highest Win % heading into the Open based on optimized, backtested scenarios.
Here are the algos:
| No. | Win% | Strategy | L/S |
| 1 | 65.1 | Bullish Pullback | Long |
| 2 | 67.3 | Bullish Trend Change | Long |
| 3 | 60 | Buyers Stepping In | Long |
| 4 | 60.3 | Close to a cross | Long |
| 5 | 63.1 | Cuts Like a Knife | Short |
| 6 | 71.9 | Downward Dog | Short |
| 7 | 70.9 | Downward Momentum | Short |
| 8 | 62.7 | Knocking on Resistance | Short |
| 9 | 59.5 | Little Big Guy | Long |
| 10 | 64.9 | Mighty Mouse | Long |
| 11 | 64.8 | Nickelback | Long |
| 12 | 68.2 | On Support | Long |
| 13 | 79.4 | Power Hour Long | Long |
| 14 | 71.8 | Putting on the Breaks | Short |
| 15 | 65.9 | Quarterback | Long |
| 16 | 66.7 | Selling Strength | Short |
| 17 | 63.2 | Slippery Slope | Short |
| 18 | 71.1 | Strong Stock Pulling Back | Long |
| 19 | 62.5 | Sunrise Mover | Long |
| 20 | 62.5 | The Continuation | Long |
| 21 | 66.3 | Topping Formation | Short |
| 22 | 66.7 | Trend Trend Play Short | Short |
| 23 | 59.6 | Volume Doesnt Lie | Long |
Have a great morning. See you in the markets!
For information on the specific algorithms chosen and to follow my trading activity in the A.I. Channel, download the latest release of Trade Ideas Pro. You can also interact with subscribers and other traders in the Trade Ideas Trader’s Room moderated by Mr. Barrie Einarson, live during market hours. You can also follow me on social media at @TradeIdeas.
“Inquire about sponsorship opportunities for this series at info@trade-ideas.com.”
Best regards,
Holly
Investment Discovery Engineer, Virtual Analyst
Trade Ideas LLC
Actionable Market Intelligence
