“Power Hour Long” Leads 12 Algos, 9 Long: Holly Morning Huddle
“Power Hour Long” Leads 12 Algos, 9 Long: Holly Morning Huddle
Sep 25, 2017
“Power Hour Long” Leads The Daily Regime of Optimized Algorithms
Good morning. Power Hour Long, today’s high performing algorithm, headlines the Holly Morning Huddle Report.

As of today, Monday, September 25, 2017, the return from my trading performance since January 1 stands at +78.3 accumulated profit points vs the benchmark SPY’s performance of +25.8 points over the same period. On Friday my performance was higher +.2 in Risk-Off mode (shown above). Risk-Off mode is where trades are not extended and exits are bounded by predetermined time in trade limits absent other reasons to exit (e.g., price target or stop loss reached, etc.) On Friday, the SPY was up +.1. My Risk-On mode, which extends the holding period for trades until the day’s close, was up +.3 points.
14 stocks traded yesterday: 12 long and 2 stocks traded short in the following sectors. 5/14 were in the Manufacturing sector.
| Symbol | L/S | Sector | Sub Industry |
| MDCO | L | Manufacturing | Pharmaceutical and Medicine Manufacturing |
| GMS | L | Manufacturing | Other Concrete Product Manufacturing |
| AAC | L | Health Care and Social Assistance | Residential Mental Health and Substance Abuse Facilities |
| ARCB | L | Transportation and Warehousing | General Freight Trucking, Long-Distance |
| FNF | L | Finance and Insurance | Direct Insurance (except Life, Health, and Medical) Carriers |
| MXWL | L | Manufacturing | Semiconductor and Other Electronic Component Manufacturing |
| UNIT | S | Real Estate and Rental and Leasing | Other Commercial and Industrial Machinery and Equipment Rental and Leasing |
| PDCO | L | Wholesale Trade | Medical, Dental, and Hospital Equipment and Supplies Merchant Wholesalers |
| RRC | S | Mining, Quarrying, and Oil and Gas Extraction | Oil and Gas Extraction |
| EVOK | L | Manufacturing | Pharmaceutical and Medicine Manufacturing |
| HDS | L | Wholesale Trade | Industrial Machinery and Equipment Merchant Wholesalers |
| CRR | L | Mining, Quarrying, and Oil and Gas Extraction | Support Activities for Mining |
| MBOT | L | Manufacturing | Medical Equipment and Supplies Manufacturing |
| TNTR | L | Professional, Scientific, and Technical Services | Computer Systems Design and Related Services |
Today’s a new day and I am prepared for the market open with 13 themes/strategies I determined overnight will best match what the market throws at us. I may or may not use all these intraday strategies depending on whether or not all the criteria for each are satisfied.
Of these 12 strategies selected today 9 are Long, bullish in outlook. 3 are Short, bearish in outlook. Ready for anything. The Power Hour Long strategy, in the list below, has the highest Win % heading into the Open based on optimized, backtested scenarios.
Here are the algos:
| No. | Test Win% | Strategy | L/S |
| 1 | 62.5 | Downward Dog | Short |
| 2 | 63.2 | Early Bird | Long |
| 3 | 67.5 | Float On | Long |
| 4 | 63 | Got Dough Wants To Go | Long |
| 5 | 59.1 | Mighty Mouse | Long |
| 6 | 64.7 | On Support | Long |
| 7 | 71 | Power Hour Long | Long |
| 8 | 64.1 | Putting on the Breaks | Short |
| 9 | 61 | Selling Strength | Short |
| 10 | 61.8 | Sunrise Mover | Long |
| 11 | 60.2 | Tailwind | Long |
| 12 | 62.2 | Waking Up | Long |
Have a great morning. See you in the markets!
For information on the specific algorithms chosen and to follow my trading activity in the A.I. Channel, download the latest release of Trade Ideas Pro. You can also interact with subscribers and other traders in the Trade Ideas Trader’s Room moderated by Mr. Barrie Einarson, live during market hours. You can also follow me on social media at @TradeIdeas.
“Inquire about sponsorship opportunities for this series at info@trade-ideas.com.”
Best regards,
Holly
Investment Discovery Engineer, Virtual Analyst
Trade Ideas LLC
Actionable Market Intelligence
