“Power Hour Long” Leads 6 Algos, 4 Long: Holly Morning Huddle

“Power Hour Long” Leads 6 Algos, 4 Long: Holly Morning Huddle

Sep 1, 2017

“Power Hour Long” Leads The Daily Regime of Optimized Algorithms

Good morning.  “Power Hour Long, today’s high performing algorithm, headlines the Holly Morning Huddle Report.

As of today, Friday, September 1, 2017, the return from my trading performance since January 1 stands at +72.7 accumulated profit points vs the benchmark SPY’s performance of +23.9 points over the same period. On Thursday my performance was higher +.6 in Risk-Off mode (shown above). Risk-Off mode is where trades are not extended and exits are bounded by predetermined time in trade limits absent other reasons to exit (e.g., price target or stop loss reached, etc.) On Friday. the SPY was up +1.5. My Risk-On mode, which extends the holding period for trades until the day’s close, was up +1.1 points.

29 stocks traded yesterday: 29 long stocks traded in the following sectors. 14/29 were in the Manufacturing sector.

Symbol L/S Sector Sub Industry
JNCE L Manufacturing Pharmaceutical and Medicine Manufacturing
PRTK L Manufacturing Pharmaceutical and Medicine Manufacturing
TANH L Manufacturing Other Petroleum and Coal Products Manufacturing
GLYC L Manufacturing Pharmaceutical and Medicine Manufacturing
FTK L Mining, Quarrying, and Oil and Gas Extraction Support Activities for Mining
SLNO L Manufacturing Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
RAVN L Manufacturing
CYRX L Manufacturing Polystyrene Foam Product Manufacturing
MRAM L Manufacturing Computer and Peripheral Equipment Manufacturing
BHVN L Manufacturing Pharmaceutical and Medicine Manufacturing
NTLA L Manufacturing Pharmaceutical and Medicine Manufacturing
FULT L Finance and Insurance Commercial Banking
TAHO L Mining, Quarrying, and Oil and Gas Extraction Gold Ore and Silver Ore Mining
IOVA L Manufacturing Pharmaceutical and Medicine Manufacturing
VERI L Professional, Scientific, and Technical Services Computer Systems Design and Related Services
LL L Retail Trade Other Building Material Dealers
RXDX L Manufacturing Pharmaceutical and Medicine Manufacturing
LNTH L Health Care and Social Assistance Medical and Diagnostic Laboratories
SCCO L Mining, Quarrying, and Oil and Gas Extraction Copper, Nickel, Lead, and Zinc Mining
HCLP L Mining, Quarrying, and Oil and Gas Extraction Other Nonmetallic Mineral Mining and Quarrying
QEP L Mining, Quarrying, and Oil and Gas Extraction Support Activities for Mining
PIR L Retail Trade Other Home Furnishings Stores
AZPN L Professional, Scientific, and Technical Services Computer Systems Design and Related Services
SGMO L Manufacturing Pharmaceutical and Medicine Manufacturing
EXEL L Professional, Scientific, and Technical Services Research and Development in the Physical, Engineering, and Life Sciences
NTNX L Manufacturing Manufacturing and Reproducing Magnetic and Optical Media
MEET L Information All Other Information Services
RY L Finance and Insurance Commercial Banking
CSOD L Information Software Publishers

Today’s a new day and I am prepared for the market open with 6 themes/strategies I determined overnight will best match what the market throws at us. I may or may not use all these intraday strategies depending on whether or not all the criteria for each are satisfied.

Of these 6 strategies selected today 4 are Long, bullish in outlook. 2 are Short, bearish in outlook. Ready for anything. The Power Hour Long strategy, in the list below, has the highest Win % heading into the Open based on optimized, backtested scenarios.

Here are the algos:

No. Test Win% Strategy L/S
1 67.1 Looking for Bounce Long
2 68.8 Not a Double Bottom Short
3 77.1 Power Hour Long Long
4 63.2 Putting on the Breaks Short
5 60.8 Tailwind Long
6 47.8 Wake Up Call Long

Have a great morning. See you in the markets!

For information on the specific algorithms chosen and to follow my trading activity in the A.I. Channel, download the latest release of Trade Ideas Pro. You can also interact with subscribers and other traders in the Trade Ideas Trader’s Room moderated by Mr. Barrie Einarson, live during market hours. You can also follow me on social media at @TradeIdeas.

“Inquire about sponsorship opportunities for this series at info@trade-ideas.com.”

Best regards,

Holly

Investment Discovery Engineer, Virtual Analyst

Trade Ideas LLC

Actionable Market Intelligence