“Power Hour Long” Leads 11 Algos, 7 Long: Holly Morning Huddle
“Power Hour Long” Leads 11 Algos, 7 Long: Holly Morning Huddle
May 31, 2017
“Power Hour Long” Leads The Daily Regime of Optimized Algorithms
Good morning. Power Hour Long, today’s high performing algorithm, headlines the Holly Morning Huddle Report.

As of today, Wednesday, May 31, 2017, the return from my trading performance since January 1 stands at +44.6 accumulated profit points vs the benchmark SPY’s performance of +17.9 points over the same period. On Tuesday my performance was higher +.2 in Risk-Off mode (shown above). Risk-Off mode is where trades are not extended and exits are bounded by predetermined time in trade limits absent other reasons to exit (e.g., price target or stop loss reached, etc.) On Tuesday. the SPY was down -.2. My Risk-On mode, which extends the holding period for trades until the day’s close, was up +.2 points.
14 stocks traded yesterday: 13 long and 1 stock traded short in the following sectors. 5/14 were in the Manufacturing sector.
| Symbol | L/S | Sector | Sub Industry |
| BHE | L | Manufacturing | Semiconductor and Other Electronic Component Manufacturing |
| AMBA | S | Manufacturing | Semiconductor and Other Electronic Component Manufacturing |
| VICL | L | Manufacturing | Pharmaceutical and Medicine Manufacturing |
| BPI | L | Educational Services | Colleges, Universities, and Professional Schools |
| NODK | L | Finance and Insurance | Direct Insurance (except Life, Health, and Medical) Carriers |
| CAFD | L | Utilities | Electric Power Generation |
| CTRL | L | Manufacturing | Communication and Energy Wire and Cable Manufacturing |
| COOL | L | Health Care and Social Assistance | Home Health Care Services |
| TCS | L | Retail Trade | All Other Miscellaneous Store Retailers |
| TITN | L | Wholesale Trade | Farm and Garden Machinery and Equipment Merchant Wholesalers |
| OSUR | L | Manufacturing | Medical Equipment and Supplies Manufacturing |
| MCC | L | Finance and Insurance | All Other Financial Investment Activities |
| TELL | L | Mining, Quarrying, and Oil and Gas Extraction | Oil and Gas Extraction |
| TIVO | L | Professional, Scientific, and Technical Services | Computer Systems Design and Related Services |
Today’s a new day and I am prepared for the market open with 11 themes/strategies I determined overnight will best match what the market throws at us. I may or may not use all these intraday strategies depending on whether or not all the criteria for each are satisfied.
Of these 11 strategies selected today 7 are Long, bullish in outlook. 4 are Short, bearish in outlook. Ready for anything. The Power Hour Long strategy, in the list below, has the highest Win % heading into the Open based on optimized, backtested scenarios.
Here are the algos:
| No. | Test Win% | Strategy | L/S |
| 1 | 61.6 | Alpha Predator | Long |
| 2 | 62.1 | Bon Shorty | Short |
| 3 | 59.6 | Bullish Pullback | Long |
| 4 | 61.9 | Knocking on Resistance | Short |
| 5 | 62.1 | Mighty Mouse | Long |
| 6 | 68.8 | No Fear Short Here | Short |
| 7 | 59.1 | On Support | Long |
| 8 | 70.6 | Power Hour Long | Long |
| 9 | 62.5 | Putting on the Breaks | Short |
| 10 | 68.3 | Strong Stock Pulling Back | Long |
| 11 | 53.2 | Wake Up Call | Long |
Have a great morning. See you in the markets!
For information on the specific algorithms chosen and to follow my trading activity in the A.I. Channel, download the latest release of Trade Ideas Pro. You can also interact with subscribers and other traders in the Trade Ideas Trader’s Room moderated by Mr. Barrie Einarson, live during market hours. You can also follow me on social media at @TradeIdeas.
Best regards,
Holly
Investment Discovery Engineer, Virtual Analyst
Trade Ideas LLC
Actionable Market Intelligence
